Sign In | Join Free | My burrillandco.com |
|
Ask Lasest Price | |
Brand Name : | CK |
Model Number : | MBR |
Certification : | ISO9001 |
Price : | CN¥6800~CN¥10000/T |
Payment Terms : | 50% prepaid, 50% paid before shipment |
Supply Ability : | 10 sets per month |
Delivery Time : | 30 days, negotiable |
Mobile Mini Sewage Water Mbr Hospital Wastewater Treatment Plant
Product Description
The device is an underground plant which adopts the advanced Biological technology and the company’s scientific research and engineering practice result, it can effectively remove BOD5,COD and NH3-N. The device is characterized by the stable performance, effective treatment, economical investment, automatic operation, convenience of maintenance and small occupying space. There is no need for plant construction, neither heating and heat preservation. The surface can be used as green land or square land.
Membrane bioreactor (MBR) is the combination of a membrane process like microfiltration or ultrafiltration with a suspended growth bioreactor, and is now widely used for municipal and industrial wastewater treatment.
Product Features
1. The MBR can make the biomass in biological treatment unit maintain high concentration, thus highly improve the volume loading. Meanwhile, the high efficient membrane separation can shorten the HRT. The device is with a compact structure and small space occupation.
2. It can realize the completely separation of HRT and SRT. By the
extended aeration, it can consume the organics, it can
theoretically achieve the effect of no excess sludge emissions,
thus reduce the surplus sludge treatment costs significantly.
3. The unique mode of operation makes the membrane surface no blocking, and the cleaning interval time is long. The way to clean the membrane is easy, since the membrane module can be separately cleaned, thus, the maintenance is convenience and simple. The module design make the machine flexible, it is easy to expand the volume.
Product Advantages
1> Can be moved conveniently ,and high adjust ability
2> Modularized assembly , can be combined with each other for
upgrade.
3> Monitored online , highly automatic .
4> Operating without noise , smell ,and environment pollution.
5> Less land occupied ,low energy consumption ,and low operation
cost.
6> The device features easy operation, automatic control, it can be buried under the ground;
Process Flow
1) Design of water according to the 400 m3 / d, 17 m3 / h;
2) Geological data is unknown, according to the conventional geological thinking, not including equipment foundation construction related fees;
3) Raw water parameter: COD 1020mg/l, BOD 450 mg/
4) Design water quality: according to Flushing standard BOD10 mg/l
Application scope
Residential area
Building water reusage
Hotel sewage processing
Hospital sewage processing
Carwashing sewage processing
High density organic sewage processing
The device can be used in treating the domestic sewage and related organic sewage;
Product Model
Model | DM-5 | DM-7 | DM-10 | DM-15 | DM-20 | |
Water capacity(m³/h) | 5 | 7 | 10 | 15 | 20 | |
Air Blower | Air volume(m³/min) | 1.02 | 1.72 | 2.5 | 4.11 | 4.11 |
Wind pressure(m.MH2O) | 5000 | 5000 | 5000 | 5000 | 5000 | |
Power(kw) | 1.5 | 2.2 | 3.7 | 5.5 | 5.5 | |
Feeding pump | Flow(m³/h) | 5 | 7 | 10 | 15 | 20 |
Lift(m) | 8 | 8 | 8 | 8 | 8 | |
Power(kw) | 0.75 | 0.75 | 0.75 | 0.75 | 0.75 | |
The measure of area(m²) | 14 | 28 | 39 | 58 | 975 |
FAQ
Q: What's the production capacity ?
A: Our factory covers an area of more than13000㎡, and produce
various of water treatment equipment 10 to 50
sets per month.
Q: What's the certification do you have?
A: We have CE, ISO9001, OHSAS18001, ISO14001 Certifications.
Q: How to package the sewage treatment plant?
A: We use standard seaworthy package.
Q: What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery
time will be within 3-4 weeks.
Q: Are you a trading company or a manufacturer ?
A: We are both , we have more than ten years of experience as a
professional manufacturer of water treatment
equipment .we also provide the comprehensive solutions for
wastewater of high COD & high TDS.
Q: How to install after the equipments arriving destination?
A: We will provide detailed illustrations to you. And we will send a technicians to guide for installation and debugging. after debugging equipment, he will teach your workers how to use it and how to maintain it.
![]() |